<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Commercial</title>
	<atom:link href="https://quaystoneprojects.co.uk/category/commercial/feed/" rel="self" type="application/rss+xml" />
	<link>https://quaystoneprojects.co.uk</link>
	<description></description>
	<lastBuildDate>Mon, 14 Sep 2026 10:04:41 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.4</generator>

<image>
	<url>https://quaystoneprojects.co.uk/wp-content/uploads/2025/12/cropped-Quaystone-32x32.jpg</url>
	<title>Commercial</title>
	<link>https://quaystoneprojects.co.uk</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Churchers Junior School phase 3</title>
		<link>https://quaystoneprojects.co.uk/churcher-junior-school-phase-3/</link>
					<comments>https://quaystoneprojects.co.uk/churcher-junior-school-phase-3/#respond</comments>
		
		<dc:creator><![CDATA[Ben]]></dc:creator>
		<pubDate>Mon, 14 Sep 2026 09:40:02 +0000</pubDate>
				<category><![CDATA[Commercial]]></category>
		<category><![CDATA[Education]]></category>
		<guid isPermaLink="false">https://quaystoneprojects.co.uk/?p=1364</guid>

					<description><![CDATA[Two new build extensions and wide-spread internal refurbishment, delivered on a fast-track programme]]></description>
										<content:encoded><![CDATA[<p dir="ltr">This project involved two new build extensions alongside wide-spread internal refurbishment works across Churchers Junior School, delivered as phase 3 of the wider scheme.</p>
<p dir="ltr">The works involved:</p>
<ul>
<li dir="ltr">New Build Construction</li>
<li dir="ltr">Wide-Spread Internal Refurbishment</li>
<li dir="ltr">Mechanical, Electrical Systems &amp; Air Handling Systems</li>
<li dir="ltr">Traditional Construction</li>
<li dir="ltr">Flat Roofing</li>
<li dir="ltr">Windows and Doors</li>
<li dir="ltr">Canopies</li>
<li dir="ltr">Classroom Refurbishment</li>
<li dir="ltr">High Specification Finishes</li>
</ul>
<p dir="ltr">The project was delivered on a fast-track programme to a high specification finish.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://quaystoneprojects.co.uk/churcher-junior-school-phase-3/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>St James Place Window Replacement</title>
		<link>https://quaystoneprojects.co.uk/st-james-place-window-replacement/</link>
					<comments>https://quaystoneprojects.co.uk/st-james-place-window-replacement/#respond</comments>
		
		<dc:creator><![CDATA[Ben]]></dc:creator>
		<pubDate>Thu, 06 Nov 2025 09:51:50 +0000</pubDate>
				<category><![CDATA[Commercial]]></category>
		<category><![CDATA[Offices]]></category>
		<guid isPermaLink="false">https://quaystoneprojects.co.uk/?p=819</guid>

					<description><![CDATA[Window upgrade project aimed at improving the building envelopes performance.]]></description>
										<content:encoded><![CDATA[<p>This project was recently completed, a contractors designed window upgrade project aimed at improving the building envelopes performance.</p>
<p>Undertaken in an occupied building.</p>
<p>Our team worked hard with the tenants to ensure there operations continued unhindered.</p>
<p>The project was completed on time and in budget.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://quaystoneprojects.co.uk/st-james-place-window-replacement/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Nursling Ambulance Station</title>
		<link>https://quaystoneprojects.co.uk/nursling-ambulance-station/</link>
					<comments>https://quaystoneprojects.co.uk/nursling-ambulance-station/#respond</comments>
		
		<dc:creator><![CDATA[Ben]]></dc:creator>
		<pubDate>Thu, 06 Nov 2025 09:46:16 +0000</pubDate>
				<category><![CDATA[Commercial]]></category>
		<category><![CDATA[Healthcare]]></category>
		<guid isPermaLink="false">https://quaystoneprojects.co.uk/?p=817</guid>

					<description><![CDATA[The scheme was aimed at improving facilities and crew wellbeing.]]></description>
										<content:encoded><![CDATA[<p>This project was recently completed, a full designed, fast track project. The scheme was aimed at improving facilities and crew wellbeing.</p>
<p>The works involved.</p>
<p>Phased Works<br />
New Crew &amp; Kitchen Refurbishment<br />
New Sluice Room Upgrades<br />
New AC Systems<br />
Re-surfacing warehouse coatings<br />
New Ceiling, Wall and floor finishes throughout.</p>
<p>The project was completed on time and in budget.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://quaystoneprojects.co.uk/nursling-ambulance-station/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Noadswood School</title>
		<link>https://quaystoneprojects.co.uk/noadswood-school/</link>
					<comments>https://quaystoneprojects.co.uk/noadswood-school/#respond</comments>
		
		<dc:creator><![CDATA[Ben]]></dc:creator>
		<pubDate>Thu, 06 Nov 2025 09:44:23 +0000</pubDate>
				<category><![CDATA[Commercial]]></category>
		<category><![CDATA[Education]]></category>
		<guid isPermaLink="false">https://quaystoneprojects.co.uk/?p=815</guid>

					<description><![CDATA[Involving the complete strip out of the college house allowing for the re-configuration of the area to aid in additional learning facilities.]]></description>
										<content:encoded><![CDATA[<p>This project was recently completed, a full designed, fast track school holiday project.</p>
<p>Involving the complete strip out of the college house allowing for the re-configuration of the area to aid in additional learning facilities.</p>
<p>These areas included</p>
<p>Salon Training area<br />
Speech Therapy Areas<br />
External Exercise Areas<br />
New Kitchen and Toilets<br />
Electrical and Fire Systems</p>
<p>The project was completed on time and under budget</p>
]]></content:encoded>
					
					<wfw:commentRss>https://quaystoneprojects.co.uk/noadswood-school/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Eastleigh College Glazed Roofing</title>
		<link>https://quaystoneprojects.co.uk/eastleigh-college-glazed-roofing/</link>
					<comments>https://quaystoneprojects.co.uk/eastleigh-college-glazed-roofing/#respond</comments>
		
		<dc:creator><![CDATA[Ben]]></dc:creator>
		<pubDate>Thu, 06 Nov 2025 09:42:09 +0000</pubDate>
				<category><![CDATA[Commercial]]></category>
		<category><![CDATA[Education]]></category>
		<guid isPermaLink="false">https://quaystoneprojects.co.uk/?p=813</guid>

					<description><![CDATA[This project was recently completed, a contractors designed, fast track school holiday project.]]></description>
										<content:encoded><![CDATA[<p>This project was recently completed, a contractors designed, fast track school holiday project.</p>
<p>The Works Involved</p>
<p>Stripping of the old glazed roofing system and replacing with a new Brett Martin X – Lock System</p>
<p>The project was completed on time and under budget</p>
]]></content:encoded>
					
					<wfw:commentRss>https://quaystoneprojects.co.uk/eastleigh-college-glazed-roofing/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Eastleigh College Roofing &#038; Window</title>
		<link>https://quaystoneprojects.co.uk/eastleigh-college-roofing-window/</link>
					<comments>https://quaystoneprojects.co.uk/eastleigh-college-roofing-window/#respond</comments>
		
		<dc:creator><![CDATA[Ben]]></dc:creator>
		<pubDate>Thu, 06 Nov 2025 09:40:45 +0000</pubDate>
				<category><![CDATA[Commercial]]></category>
		<category><![CDATA[Education]]></category>
		<guid isPermaLink="false">https://quaystoneprojects.co.uk/?p=811</guid>

					<description><![CDATA[This project was recently completed, a full designed, extremely fast track school holiday project.]]></description>
										<content:encoded><![CDATA[<p>This project was recently completed, a full designed, extremely fast track school holiday project.</p>
<p>The Works Involved</p>
<p>Stripping of the old flat roofing system and replacing with a new Suprema Insulated 3 layer flat roof system<br />
Removing old high level crittal windows and replacing with new Smarts Aluminium Glazing system</p>
<p>The project was completed on time and under budget</p>
]]></content:encoded>
					
					<wfw:commentRss>https://quaystoneprojects.co.uk/eastleigh-college-roofing-window/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Eastleigh College Boiler Upgrade</title>
		<link>https://quaystoneprojects.co.uk/eastleigh-college-boiler-upgrade/</link>
					<comments>https://quaystoneprojects.co.uk/eastleigh-college-boiler-upgrade/#respond</comments>
		
		<dc:creator><![CDATA[Ben]]></dc:creator>
		<pubDate>Thu, 06 Nov 2025 09:38:37 +0000</pubDate>
				<category><![CDATA[Commercial]]></category>
		<category><![CDATA[Education]]></category>
		<guid isPermaLink="false">https://quaystoneprojects.co.uk/?p=747</guid>

					<description><![CDATA[This project was recently completed, a full designed, fast track school holiday project.]]></description>
										<content:encoded><![CDATA[<p class="p1"><span class="s1">This project was recently completed, a full designed, fast track school holiday project.</span></p>
<p class="p1"><span class="s1">Involving the removal and the replacement of Eastleigh college’s main heating plant room.</span></p>
<p class="p1"><span class="s1">Three large main boilers were stripped out, replaced with 14 commercial Valiant boilers involving a new single flue complexed flue arrangement. </span></p>
<p class="p2"><span class="s1">The project was completed on time and under budget</span></p>
]]></content:encoded>
					
					<wfw:commentRss>https://quaystoneprojects.co.uk/eastleigh-college-boiler-upgrade/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Bracknell Ambulance Station</title>
		<link>https://quaystoneprojects.co.uk/bracknell-ambulance-station/</link>
					<comments>https://quaystoneprojects.co.uk/bracknell-ambulance-station/#respond</comments>
		
		<dc:creator><![CDATA[Ben]]></dc:creator>
		<pubDate>Wed, 05 Nov 2025 15:56:17 +0000</pubDate>
				<category><![CDATA[Commercial]]></category>
		<category><![CDATA[Healthcare]]></category>
		<guid isPermaLink="false">https://quaystoneprojects.co.uk/?p=735</guid>

					<description><![CDATA[This project was recently completed, a full designed, fast track project. The scheme was aimed at improving facilities and crew wellbeing.]]></description>
										<content:encoded><![CDATA[<p class="p1"><span class="s1">This project was recently completed, a full designed, fast track project. The scheme was aimed at improving facilities and crew wellbeing.</span></p>
<p class="p1"><span class="s1">The works involved.</span></p>
<ul class="ul1">
<li class="li1"><span class="s1">Full electrical re-wire</span></li>
<li class="li1"><span class="s1">New Crew &amp; Kitchen Refurbishment</span></li>
<li class="li1"><span class="s1">New Sluice Room Upgrades </span></li>
<li class="li1"><span class="s1">New AC Systems</span></li>
<li class="li1"><span class="s1">Re-surfacing warehouse coatings</span></li>
<li class="li1"><span class="s1">New EV Charging Points</span></li>
<li class="li1"><span class="s1">New Ceiling, Wall and floor finishes throughout.</span></li>
</ul>
<p class="p1"><span class="s1">Due to the ongoing operations that had to continue throughout the project, works were carefully planed and all electrical change overs programmed with such care that the requirement to prove a ups generator was negated. Welldone team!</span></p>
<p class="p2"><span class="s1">The project was completed on time and in budget and furthermore improved the well being and working facilities of our valuable emergency care services!</span></p>
]]></content:encoded>
					
					<wfw:commentRss>https://quaystoneprojects.co.uk/bracknell-ambulance-station/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>ST Georges Catholic School</title>
		<link>https://quaystoneprojects.co.uk/st-georges-catholic-school/</link>
					<comments>https://quaystoneprojects.co.uk/st-georges-catholic-school/#respond</comments>
		
		<dc:creator><![CDATA[Ben]]></dc:creator>
		<pubDate>Wed, 05 Nov 2025 14:49:36 +0000</pubDate>
				<category><![CDATA[Commercial]]></category>
		<category><![CDATA[Education]]></category>
		<guid isPermaLink="false">https://quaystoneprojects.co.uk/?p=668</guid>

					<description><![CDATA[Design &#038; Build scheme which was aimed at athletically improving the longevity of two school cabins]]></description>
										<content:encoded><![CDATA[<p>This project was recently completed a Design &amp; Build scheme which was aimed at athletically improving the longevity of two school cabins, up grading the superstructure to offer a 25 year lifespan. But also bringing it in line with the more resent construction works surrounding the current facilities on site. The works involved:</p>
<p>Structural façade steelworks, façade systems including G-brick insulated brick panel system.<br />
SMART Aluminium window and door systems.<br />
New single ply and composite panel roof construction completed with a 25 year warranty.<br />
New internal ceilings, walls, doors. Finishes and toilet facilities.<br />
Fully wired with LED lighting and panel heating.</p>
<p>The project was completed on time and in budget.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://quaystoneprojects.co.uk/st-georges-catholic-school/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Churchers Junior School</title>
		<link>https://quaystoneprojects.co.uk/churchers-junior-school/</link>
					<comments>https://quaystoneprojects.co.uk/churchers-junior-school/#respond</comments>
		
		<dc:creator><![CDATA[Ben]]></dc:creator>
		<pubDate>Wed, 05 Nov 2025 14:42:11 +0000</pubDate>
				<category><![CDATA[Commercial]]></category>
		<category><![CDATA[Education]]></category>
		<guid isPermaLink="false">https://quaystoneprojects.co.uk/?p=662</guid>

					<description><![CDATA[Fully designed, education project]]></description>
										<content:encoded><![CDATA[<p>This project was recently completed, a fast track school holiday project. Fully designed, education project. The scheme was aimed at increasing teaching area improving current facilities.</p>
<p>The works involved;</p>
<p>Fully designed new build &#8211; New foundations, new block and beam floor.<br />
Masonry superstructure with SMART Aluminium window and door systems.<br />
New roof construction completed with 25year single ply roof.<br />
Internally; New internal ceilings, walls, doors. Finishes and junior toilet facilities.<br />
Fully wired with LED lighting, underfloor heating and Smart teach board technology.</p>
<p>The project was completed on time and in budget.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://quaystoneprojects.co.uk/churchers-junior-school/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>

<!--
Performance optimized by W3 Total Cache. Learn more: https://www.boldgrid.com/w3-total-cache/?utm_source=w3tc&utm_medium=footer_comment&utm_campaign=free_plugin

Page Caching using Disk: Enhanced 

Served from: quaystoneprojects.co.uk @ 2026-11-01 21:50:51 by W3 Total Cache
-->