<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Industrial</title>
	<atom:link href="https://quaystoneprojects.co.uk/category/industrial/feed/" rel="self" type="application/rss+xml" />
	<link>https://quaystoneprojects.co.uk</link>
	<description></description>
	<lastBuildDate>Mon, 14 Sep 2026 09:47:54 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.4</generator>

<image>
	<url>https://quaystoneprojects.co.uk/wp-content/uploads/2025/12/cropped-Quaystone-32x32.jpg</url>
	<title>Industrial</title>
	<link>https://quaystoneprojects.co.uk</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Industrial Refurbishment</title>
		<link>https://quaystoneprojects.co.uk/industrial-refurbishment/</link>
					<comments>https://quaystoneprojects.co.uk/industrial-refurbishment/#respond</comments>
		
		<dc:creator><![CDATA[Ben]]></dc:creator>
		<pubDate>Mon, 14 Sep 2026 09:43:31 +0000</pubDate>
				<category><![CDATA[Industrial]]></category>
		<guid isPermaLink="false">https://quaystoneprojects.co.uk/?p=1370</guid>

					<description><![CDATA[This project was recently completed, a full designed, industrial project]]></description>
										<content:encoded><![CDATA[<p dir="ltr">This project was recently completed, a full designed, industrial project. The scheme involved heavy demolition followed by a comprehensive re-roof and re-cladding, along with new dock levellers, overhead doors, and fully designed electrical, PV, mechanical and air handling systems, plus full internal office and warehouse refurbishment.</p>
<p dir="ltr">The works involved.</p>
<ul>
<li dir="ltr">New Roof</li>
<li dir="ltr">New Wall Cladding</li>
<li dir="ltr">Steel Works</li>
<li dir="ltr">Dock Levellers</li>
<li dir="ltr">Windows</li>
<li dir="ltr">New Office Construction</li>
<li dir="ltr">New Toilets &amp; Kitchen Refurbishment</li>
<li dir="ltr">Re-surfacing Warehouse Coatings</li>
<li dir="ltr">New Ceiling, Wall and Floor Finishes Throughout</li>
</ul>
<p dir="ltr">The project was completed on time and in budget.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://quaystoneprojects.co.uk/industrial-refurbishment/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Unit 810 Fareham Reach</title>
		<link>https://quaystoneprojects.co.uk/unit-810-fareham-reach/</link>
					<comments>https://quaystoneprojects.co.uk/unit-810-fareham-reach/#respond</comments>
		
		<dc:creator><![CDATA[Ben]]></dc:creator>
		<pubDate>Thu, 06 Nov 2025 09:57:45 +0000</pubDate>
				<category><![CDATA[Industrial]]></category>
		<guid isPermaLink="false">https://quaystoneprojects.co.uk/?p=828</guid>

					<description><![CDATA[This project was recently completed, a full designed, industrial project]]></description>
										<content:encoded><![CDATA[<p>This project was recently completed, a full designed, industrial project. The scheme was aimed at improving facilities to a letting standard.</p>
<p>The works involved.</p>
<p>New Lighting upgrades<br />
New Office Construction<br />
New Toilet &amp; Kitchen Refurbishment<br />
Re-surfacing warehouse coatings<br />
New Ceiling, Wall and floor finishes throughout.</p>
<p>The project was completed on time and in budget.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://quaystoneprojects.co.uk/unit-810-fareham-reach/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Unit D22 Heritage Business Park</title>
		<link>https://quaystoneprojects.co.uk/unit-d22-heritage-business-park/</link>
					<comments>https://quaystoneprojects.co.uk/unit-d22-heritage-business-park/#respond</comments>
		
		<dc:creator><![CDATA[Ben]]></dc:creator>
		<pubDate>Thu, 06 Nov 2025 09:56:09 +0000</pubDate>
				<category><![CDATA[Industrial]]></category>
		<guid isPermaLink="false">https://quaystoneprojects.co.uk/?p=826</guid>

					<description><![CDATA[The scheme was aimed at improving facilities to a letting standard]]></description>
										<content:encoded><![CDATA[<p>This project was recently completed, a full designed, fast track industrial project. The scheme was aimed at improving facilities to a letting standard.</p>
<p>The works involved.</p>
<p>Strip out<br />
New Toilet &amp; Kitchen Refurbishment<br />
Re-surfacing warehouse coatings<br />
New Ceiling, Wall and floor finishes throughout.</p>
<p>The project was completed on time and in budget.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://quaystoneprojects.co.uk/unit-d22-heritage-business-park/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Unit 3 Carvers Ind Est</title>
		<link>https://quaystoneprojects.co.uk/unit-3-carvers-ind-est/</link>
					<comments>https://quaystoneprojects.co.uk/unit-3-carvers-ind-est/#respond</comments>
		
		<dc:creator><![CDATA[Ben]]></dc:creator>
		<pubDate>Thu, 06 Nov 2025 09:54:24 +0000</pubDate>
				<category><![CDATA[Industrial]]></category>
		<guid isPermaLink="false">https://quaystoneprojects.co.uk/?p=824</guid>

					<description><![CDATA[The projects aim was at improving facilities to a letting standard]]></description>
										<content:encoded><![CDATA[<p>This project was recently completed, a full designed, fast track industrial project. The scheme was aimed at improving facilities to a letting standard.</p>
<p>The works involved.</p>
<p>New Composite Roof &amp; Wall Cladding<br />
New Office Construction<br />
New Toilet &amp; Kitchen Refurbishment<br />
Re-surfacing warehouse coatings<br />
Masonry Works<br />
New Ceiling, Wall and floor finishes throughout.</p>
<p>The project was completed on time and in budget.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://quaystoneprojects.co.uk/unit-3-carvers-ind-est/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Unit 610 Fareham Reach</title>
		<link>https://quaystoneprojects.co.uk/unit-610-fareham-reach/</link>
					<comments>https://quaystoneprojects.co.uk/unit-610-fareham-reach/#respond</comments>
		
		<dc:creator><![CDATA[Ben]]></dc:creator>
		<pubDate>Wed, 05 Nov 2025 15:52:52 +0000</pubDate>
				<category><![CDATA[Industrial]]></category>
		<guid isPermaLink="false">https://quaystoneprojects.co.uk/?p=727</guid>

					<description><![CDATA[This project was recently completed, a full designed, industrial project. The scheme was aimed at improving facilities to a letting standard.]]></description>
										<content:encoded><![CDATA[<p class="p1"><span class="s1">This project was recently completed, a full designed, industrial project. The scheme was aimed at improving facilities to a letting standard.</span></p>
<p class="p1"><span class="s1">The works involved.</span></p>
<ul class="ul1">
<li class="li1"><span class="s1">New Composite Roof &amp; Wall Cladding</span></li>
<li class="li1"><span class="s1">New Office Construction</span></li>
<li class="li1"><span class="s1">New Toilet &amp; Kitchen Refurbishment</span></li>
<li class="li1"><span class="s1">Re-surfacing warehouse coatings</span></li>
<li class="li1"><span class="s1">New Ceiling, Wall and floor finishes throughout.</span></li>
</ul>
<p class="p2"><span class="s1">The project was completed on time and in budget.</span></p>
]]></content:encoded>
					
					<wfw:commentRss>https://quaystoneprojects.co.uk/unit-610-fareham-reach/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Unit 310 Fareham Reach</title>
		<link>https://quaystoneprojects.co.uk/unit-310-fareham-reach/</link>
					<comments>https://quaystoneprojects.co.uk/unit-310-fareham-reach/#respond</comments>
		
		<dc:creator><![CDATA[Ben]]></dc:creator>
		<pubDate>Wed, 05 Nov 2025 15:37:04 +0000</pubDate>
				<category><![CDATA[Industrial]]></category>
		<guid isPermaLink="false">https://quaystoneprojects.co.uk/?p=702</guid>

					<description><![CDATA[This project was recently completed, a full designed, industrial project. The scheme was aimed at improving facilities to a letting standard.]]></description>
										<content:encoded><![CDATA[<p>This project was recently completed, a full designed, industrial project. The scheme was aimed at improving facilities to a letting standard.</p>
<p>The works involved.</p>
<p>New Composite Roof &amp; Wall Cladding<br />
New Office Construction<br />
New Toilet &amp; Kitchen Refurbishment<br />
Re-surfacing warehouse coatings<br />
New Ceiling, Wall and floor finishes throughout.</p>
<p>The project was completed on time and in budget.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://quaystoneprojects.co.uk/unit-310-fareham-reach/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Unit 360 Fareham Reach</title>
		<link>https://quaystoneprojects.co.uk/unit-360-fareham-reach/</link>
					<comments>https://quaystoneprojects.co.uk/unit-360-fareham-reach/#respond</comments>
		
		<dc:creator><![CDATA[Ben]]></dc:creator>
		<pubDate>Wed, 05 Nov 2025 15:29:59 +0000</pubDate>
				<category><![CDATA[Industrial]]></category>
		<guid isPermaLink="false">https://quaystoneprojects.co.uk/?p=697</guid>

					<description><![CDATA[This project was recently completed, a full designed, industrial project, incorporating infrastructure upgrades.]]></description>
										<content:encoded><![CDATA[<p>This project was recently completed, a full designed, industrial project, incorporating infrastructure upgrades. The scheme was aimed at improving facilities to a letting standard, parking and road access on and off the site.</p>
<p>The works involved.</p>
<p>New Wall Cladding<br />
Curtain Walling<br />
New Office Construction<br />
New Toilet &amp; Kitchen Refurbishment<br />
Re-surfacing warehouse coatings<br />
New Ceiling, Wall and floor finishes throughout.</p>
<p>The project was completed on time and in budget.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://quaystoneprojects.co.uk/unit-360-fareham-reach/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Unit F Moorside Road</title>
		<link>https://quaystoneprojects.co.uk/unit-f-moorside-road/</link>
					<comments>https://quaystoneprojects.co.uk/unit-f-moorside-road/#respond</comments>
		
		<dc:creator><![CDATA[Ben]]></dc:creator>
		<pubDate>Wed, 05 Nov 2025 15:21:25 +0000</pubDate>
				<category><![CDATA[Industrial]]></category>
		<guid isPermaLink="false">https://quaystoneprojects.co.uk/?p=691</guid>

					<description><![CDATA[This project was recently completed, a full designed, industrial project. The scheme was aimed at improving facilities to a letting standard.]]></description>
										<content:encoded><![CDATA[<p>This project was recently completed, a full designed, industrial project. The scheme was aimed at improving facilities to a letting standard.</p>
<p>The works involved.</p>
<p>Refurbished office core.<br />
Refurbished bathrooms with new hot water systems<br />
Asbestos removal, re-roofing with new composite roof and wall panels.<br />
New insulated roller door.<br />
Internally the unit was completely re-wired with new electrical and air handling systems.</p>
<p>The project was completed 2.5 weeks early and under budget.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://quaystoneprojects.co.uk/unit-f-moorside-road/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Unit 1A &#038; 1B Chertsey Ind Estate</title>
		<link>https://quaystoneprojects.co.uk/unit-1a-1b-chertsey-ind-estate/</link>
					<comments>https://quaystoneprojects.co.uk/unit-1a-1b-chertsey-ind-estate/#respond</comments>
		
		<dc:creator><![CDATA[Ben]]></dc:creator>
		<pubDate>Wed, 05 Nov 2025 15:11:15 +0000</pubDate>
				<category><![CDATA[Industrial]]></category>
		<guid isPermaLink="false">https://quaystoneprojects.co.uk/?p=686</guid>

					<description><![CDATA[Recently completed fully designed, industrial project]]></description>
										<content:encoded><![CDATA[<p>This project was recently completed, a full designed, industrial project. The scheme was aimed at improving facilities to a letting standard.</p>
<p>The works involved.</p>
<p>Fully designed office core enclosing and open plan office with Asbestos removal, re-roofing with new composite roof and wall panels. New internal fire rated office and welfare facility walls. New composite vertical cladding, overhead doors and Aluminium glazing systems.<br />
Internally the unit was completely re-wired with new electrical and air handling systems with new structural dividing wall.</p>
<p>The project was completed on time and in budget.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://quaystoneprojects.co.uk/unit-1a-1b-chertsey-ind-estate/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Unit 300 Fareham Reach</title>
		<link>https://quaystoneprojects.co.uk/unit-300-fareham-reach/</link>
					<comments>https://quaystoneprojects.co.uk/unit-300-fareham-reach/#respond</comments>
		
		<dc:creator><![CDATA[Ben]]></dc:creator>
		<pubDate>Wed, 05 Nov 2025 15:01:32 +0000</pubDate>
				<category><![CDATA[Industrial]]></category>
		<guid isPermaLink="false">https://quaystoneprojects.co.uk/?p=680</guid>

					<description><![CDATA[The scheme was aimed at improving facilities to a letting standard.]]></description>
										<content:encoded><![CDATA[<p>This project was recently completed, a full designed, industrial project. The scheme was aimed at improving facilities to a letting standard.</p>
<p>The works involved.</p>
<p>Fully designed office core enclosing and open plan office with Asbestos removal, re-roofing with new composite roof and wall panels. New internal fire rated office and welfare facility walls. Partioning and glazed screens.<br />
Substation decommissioning, power changeovers works where undertaken. Generator powered within this period.<br />
Internally the unit was completely re-wired with new electrical and air handling systems, Curtain walling, glazing.</p>
<p>The project was completed on time and in budget.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://quaystoneprojects.co.uk/unit-300-fareham-reach/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>

<!--
Performance optimized by W3 Total Cache. Learn more: https://www.boldgrid.com/w3-total-cache/?utm_source=w3tc&utm_medium=footer_comment&utm_campaign=free_plugin

Page Caching using Disk: Enhanced 

Served from: quaystoneprojects.co.uk @ 2026-11-01 21:50:18 by W3 Total Cache
-->