New & Recent Projects

Complete high end internal domestic refurbishment

Quaystone has completed a full high end domestic refurbishment including Structural kitchen refurbishment, bathrooms, new heating systems, service supplies and refurbishment to all rooms

Guest accommodation, Andover – Current

Commencing in August 2018, Quaystone have been appointed to construct a new, single storey, timber framed building to provide guest accommodation at a private residence near Andover.

The charming ‘stable style’ building includes 4 bedrooms, 3 bathrooms and a small kitchen/lounge area with wood burning stove.

As the contract is going so well, the client has awarded the Quaystone team a further contract to construct a new barn-style building on the same site.New Microsoft Publisher Document

file1

Former IAC Warehouse – Complete

This project was completed early September 2018, with the first phase successfully handed over earlier for tenant fit-out. Works involved complete stripping out, internal demolition and complete refurbishment to both the interior and exterior of this industrial unit of nearly 10,000m2. The warehouse is divided into two, handing one over as a shell and core, with new commercial windows, cladding, replacement roof lights and gutter linings.

The other unit has been fully refurbished with:-

  • Replacement of roof lights, replacement gutter liners
  • Designed mechanical and electrical systems
  • Designed steelwork to dividing wall
  • New commercial aluminium windows, cladding and flashings
  • New partitioning, washrooms
  • Ceilings, flooring and redecorations including epoxy floor

 

Cathedral Walk, Guildford – Complete

This fast track project was handed over in April.  Works involve emptying, stripping out and complete refurbishment to both the interior and exterior of this industrial unit.

The works are varied and extensive including:-

  • Replacement of roof lights
  • Removal of additional partitions and mezzanine floor
  • Removal and replacement of heating system
  • General repairs including replacing glazing units and repairing external envelope
  • Complete redecoration internally

The unit is in a terrace of business units, with occupied premises either side so access to their businesses is to be maintained as well as ensuring our works do not cause any disruption.

Roman Landing, Southampton – Complete

In March 2018 Quaystone completed the full internal refurbishment of ground, first and second floor offices at Roman Landing, St Mary’s Place, Southampton for CBRE.

Works to the 825m² space included full strip out and refurbishment including:-

  • New suspended ceilings
  • New raised access floors
  • Redecoration
  • New carpets
  • M&E upgrades including new lighting, power distribution and fire systems
  • New air conditioning systems throughout

The third and fourth floors were occupied so the team needed to liaise closely with tenants to coordinate works and ensure cleanliness and safety of any shared circulation areas was maintained.

Particular care was required regarding noise and power as one of the occupants is a local radio station.

 

Swan Centre, Eastleigh – Complete

Structural Asphalt Roof Re-surfacing – Employer’s Agent – JLL

Working in the public car park area of the Swan Centre shopping centre in Eastleigh, our team has carried out extensive repairs and resurfacing works including:-

  • Individual repairs to surfacing
  • Waterproofing works
  • Widespread removal and renewal of asphalt ramps
  • Phased closures for works
  • Traffic management including public safety measures

Using our own approved tradesmen to carry out the works with a full-time working supervisor and a team of our approved subcontractors we have been able to carry out the works with minimum disruption to this busy shopping centre.

 Unit 2 Nuffield Trade Centre, Poole – Complete

End of lease dilapidation works for the landlord, involving internal refurbishment and fully guaranteed Giromax cladding repairs – Employer’s Agent – LSH

Nuffield Trade

51 & 52 Broad Street Reading, H&M – Complete

Quaystone Projects are happy to announce that they have completed another successful project for CBRE. The full re-roof was undertaken on the fully operational H&M store in Reading on a very busy High Street! With great organisation and liaison from our site manager Ashley, we were able to deliver the project both under budget and on time, with a full insurance backed guarantee for 15 years.

‘I would like to give some feedback on your guys working on the roof; they have been amazing and I would recommend them to any other companies that might need roof repairs. They are all a positive group and very friendly!’ – H&M Store Manager

Launcyln Close, Rear Extension – Complete

Quaystone completed a bespoke rear extension to a house in North Baddesley. Our team has worked exceptionally well in such a small amount of time, giving the family some much need additional space!

Fleets Corner Industrial Park, Poole – Civil & Structural Refurbishment – Complete

Works included lifting and disposal of existing concrete trench covers. Forming suspended designed concrete road slabs housing an existing high pressure gas main in two phases:-

  • Suspended formwork
  • Designed RC Slabs, Columns and Beams
  • Working in air vented deep excavations
  • Busy industrial estate with constant lorry traffic
  • Consultation with businesses on the estate
  • Coordinated road closures and traffic management

Fareham Reach Industrial Park, External Refurbishment

Full external refurbishment of an occupied office building.  This included:-

  • Re-roofing asphalt roofs
  • Masonry repairs
  • Re-rendering structural repairs
  • External redecorations
  • Giromax Seamsil cut edge treatment
  • Giromax Delcote silicone coating finish to roof sheeting
  • Plygene gutter linings

Imperial House, Southampton – 2 floors of WC & 3 Floors of Office Refurbishment – Complete

A full refurbishment of three vacant floors, common areas and toilet facilities in an office building whilst one floor was in occupation.  Works included:-

  • Internal redecoration
  • Ceilings
  • Flooring
  • M&E installation
  • Lighting
  • New toilet facilities
  • Reception areas

Using our direct tradesmen included a dedicated site supervisor, we were able to complete the works successfully and with minimal disruption to the

 Odiham, Henderson Suite Refurbishment – Complete

Refurbishment of room to mess room including decoration, flooring and bespoke radiator covers.

Unit 2 & 3 Riverway, Alton – Full internal and external refurbishment

A full refurbishment of these two business units ready for re-occupation.  The external envelope was fully refurbished to improve appearance and asset longevity, with internal areas modernised and renewed.  Works included:-

  • Giromax Delcote specialist silicone coatings to roof
  • Giromax Deglaze roof light treatments
  • Giromax Girocote coatings to external cladding
  • Internal redecoration
  • Ceilings
  • Flooring
  • M&E installation
  • Lighting
  • New toilet facilities
  • Reception areas

 

Kennedy Road, Southampton – Front & Side Extension with paving works – Complete